How Much Does a Patio Cost in the UK?
Typical price: £90 to £160 (indian sandstone, supply and lay; per m2 laid). This guide uses 4 published 2026 sources and shows where they disagree.
Patio prices at a glance
| What you are paying for | Price (per m2 laid) |
|---|---|
| Indian sandstone, supply and lay | £90 to £160 |
| Porcelain, supply and lay | £120 to £220 |
| Mid-range sandstone or limestone | £120 to £170 |
| Patio laying labour only | £50 to £80 |
| 20 m2 patio | £1,800 to £3,600 |
| Slabs only, sandstone | £18 to £40 |
Figures are November 2026 estimates from the sources listed below. Your own quote may be higher or lower.
What affects the price
- Material: Indian sandstone is cheaper than porcelain, while natural stone costs more.
- Size and shape: curves and cutting add labour.
- Groundwork: levelling, a sub-base and drainage.
- Access: if all the materials have to be carried through the house, labour costs more.
Regional differences
Groundworks, drainage, access and London pricing move totals by 20% to 40%. Prices also change with local demand, how easy it is to reach the job and the time of year, so use these ranges as a starting point rather than a fixed price.
Porcelain takes longer to lay (12 to 20 m2 a day per person) than calibrated sandstone (25 to 40 m2), so labour costs more.
How to pay less
- Measure the area and ask for a price per square metre.
- Compare supply-and-lay with buying slabs yourself.
- Check the contractor lays on a mortar bed, not just sand.
A worked example
If your quote for the main item (indian sandstone, supply and lay) lands at the middle of the range, that is about £125. A quote below £90 is worth questioning: ask what has been left out. A quote above £160 is not necessarily wrong, but ask for a breakdown and compare it with at least two other firms.
Why prices differ so much
The sources we reviewed do not always agree, and that is normal for patio. Many guides are written by trade firms or lead-generation sites, and each defines the job a little differently: some include VAT, some leave out the preparation or making good, and some are averages of real quotes while others are estimates. In this guide the lowest figure listed is £18 (slabs only, sandstone) and the highest is £3,600 (20 m2 patio). Treat the range as the zone where most quotes fall, not as a promise. Outdoor jobs are affected by access, ground conditions and the time of year. Groundworks, waste removal and any council permits are the items most often left out of a cheap quote.
How to get an accurate quote
- Measure the area yourself before asking for quotes, so you can sanity-check the price per square metre.
- Ask whether excavation, drainage and waste removal are included.
- Check whether you need planning permission or a council permit.
- Get at least three quotes and compare the materials named in each.
- Ask for a guarantee in writing.
- Avoid anyone who knocks on the door offering a cheap deal today.
Frequently asked questions
Is porcelain or sandstone better for a patio?
Porcelain is hard-wearing and low maintenance. Sandstone is cheaper and looks more natural but needs sealing.
How long does it take to lay a patio?
A 20 square metre patio usually takes two to four days.
How much to lay a patio?
Typical prices run £90 to £160 (indian sandstone, supply and lay). See the table above for the full breakdown.
Where do the figures on this page come from?
They come from BestBuilders patio cost, Trade2Base patio laying costs, Book a Builder patio replacement cost. All sources are linked at the bottom of the page.
Sources and method
- BestBuilders patio cost
- Trade2Base patio laying costs
- Book a Builder patio replacement cost
- MyJobQuote patio installation cost
Page last updated November 2026. See our editorial policy and disclaimer.